Our Projects

Tunnel Designs

  • We Assessed of tunnel's environment (dimensions, shape, and construction materials) to identify the placement and configuration of the leaky cable

  • Determined Coverage and Capacity requirements of the tunnel based on the factors such as the its used (e.g. transportation, mining), expected traffic volume, and the types of wireless communication (e.g., voice, data)

  • Strategically planned the placement of the leaky cable within the tunnel to achieve uniform coverage. Consider the tunnel's curves, bends and elevation changes, and obstructions like pillars or equipment

  • Designed with redundancy that can provide reliable communication in emergency situations, such as fires or accidents

Project Delivered
9
Regions

Europe & APAC

Key Highlights

Longest Tunnel: 13kms

Sector:17 (Tunnel + Station)

No of Remote Units: 34

Airport Design

  • Identified areas within the airport, such as terminals, Arrival, Departure, Apron,Baggage and critical operational zones, where wireless coverage is essential forpassenger

  • Analyzed passenger traffic patterns to determine peak usage areas

  • Planned coverage including 2G, 3G, 4G, 5G, Wi-Fi, Public safety (emergencyServices)

  • Planned capacity to handle traffic loads, especially during peak travel time

Project Delivered

15+

Regions

Europe & APAC

Key Highlights

Largest Area: 9.7M sqft

Sector: 48

No of Remote Units: 92

Technology: Cellular & Public Safety

Stadium Designs

  • We evaluated user density in various areas of the stadium, especially seating areas,concourses, and premium suites and anticipate peak traffic loads with the help ofhistorical data, and forecast capacity requirements

  • Collaborated with mobile Operators/Carries to understand their expected dataloads and capacity needs

  • Implemented load-balancing mechanisms to evenly distribute user traffic acrossDAS antennas and sectors

  • Every design was scalable for future technology upgrades and capacity demands

Project Delivered

20+

Regions

All

Key Highlights

Sector: 36

No of Remote Units: 48 (Bowl+Concourse+Parking)

Technology: Cellular

Commercials And Residentials

  • First understood the specific wireless communication needs of the building's tenants, including mobile network coverage, Wi-Fi, and other services

  • Assessed the building's structure, including its height, layout, and construction materials, to determine the optimal placement antennas

  • Determined coverage areas within the building and the expected capacity demands, especially in high-traffic areas like lobbies, conference rooms, canteens, and common spaces.

  • Designed DAS for multiple mobile carriers to ensure that tenants have a choice of service providers within the building

  • Designed with scalability and flexibility in mind to accommodate technology upgrades as well as changing tenant requirements

Project Delivered

200+

Regions

All

Key Highlights

Largest Area: 8M sqft

Sector: 16

No of Remote Units: 58

Technology: Cellular & Wi-Fi